Représentant des ventes

Sorry, this entry is only available in Français.

Project manager (Montreal division)

Techni-Arp is looking for a project manager for the Montréal region to meet site technicians’ support needs.

Job requirements:

  • Two years’ experience in staff supervision
  • Vocational diploma in surveying and topography, college diploma in civil engineering or bachelor’s degree in geomatics
  • Ten years’ experience in construction site surveying
  • Experience with GPS and/or robotized Leica and Trimble devices
  • Experience with Civil 3D
  • Regional mobility

Responsibilities:

  • Supervise technicians in their site work
  • Responsible for surveying equipment and vehicles
  • Carry out weekly follow-ups with clients and technicians
  • Keep equipment inventory up to date
  • Order computer drawings from engineering consulting firms
  • Draft compliance or TQC reports
  • Perform some preparatory calculations for site technicians
  • Hire new employees and interns during the summer
  • Make schedules for part-time sites
  • Send quotes to potential customers
  • Provide training to struggling employees and at the CCQ
  • Ensure smooth operation of the various sites
  • Settle personal or professional disputes

Land survey technician

We are always looking for survey technicians to join our dynamic team.

Job requirements:

  • Hold CCQ competency certificates
  • Vocational diploma in surveying and topography or college diploma in civil engineering
  • Two years’ experience in construction site surveying
  • Experience with GPS and/or robotized Leica and Trimble devices
  • Experience with Civil 3D is an asset
  • Regional mobility is an asset

Responsibilities:

Carry out civil engineering work from the plans and specifications prepared by engineers. Projects are mainly specialized in civil engineering, municipal work, dams, commercial buildings and bridges, and are carried out throughout the province of Quebec. Site technicians will be responsible for monitoring their full-time contract, always under the supervision of an estimator and an operations supervisor.

We will deal with your application in the utmost confidentiality. Unless we state otherwise, we will keep your resume for a period of two years. We will contact you if the job fits your profile. Thank you for showing interest in our company.

Les Monts-Otish, Qc

techni-arp

Intersection du Lac Albanel

techni-arp

Pont du kilomètre 39+000 et chemin de contournement

techni-arp

Carrière du kilomètre 55+000

techni-arp
techni-arp

Prolongement de la route 167N, KM 0@72 vers les Monts-Otish, Stornoway Diamonds Corporation. Projet du ministère des transports Période d’exécution: Juillet 2013 à Octobre 2014

Castelgar, British Columbia

techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp

Kuujjuaq

techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp

Establishment of a new air terminal and a parking for plane.

Period of execution from June 2006 to August 2007.
Total cost of the project: 10 000 000$

Mercier, QC

techni-arp

Construction and widening of Road 138 in Mercier Phase II (Quebec transport)

From June to 2007 to June 2008
Global cost: 18 000 000$

Beauceville, QC

techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp

Prolongation of the Robert-Cliche highway A-73 at Beauceville

From de July 2006 to November 2007
Global cost: 71 000 000$

Québec, QC

techni-arp

Parc de la rivière St-Charles

techni-arp

Pont du CN Duplessis/Hamel

techni-arp

Pont Dominium Québec

Restoration of the St-Charles’s river banks

From 2005 to 2007
Global cost: 20 000 000$

Installation of the Commemoration Park of the Drouin Bridge’s old fortification

From 2007 to 2008
Global cost: 750 000$

Demolition of the straps dufferin/montmorency in Quebec

Period of execution from April 2007 to December 2007
total Cost of the project: 22 000 000$

Carnival of Quebec and the 400ième birthday of Quebec 2008

Period of execution from December 2007 to January 2014

Petite-Rivière-Saint-François, QC

techni-arp
techni-arp
techni-arp
techni-arp
techni-arp

Hameau du Massif de la Petite Rivière St-François tourist development

Period of execution from August 2007 to December 2007
total Cost of the project: 2 500 000$

Gaspésie, QC

techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp

Establishment of a new road (sewer and aqueduct) on 2KM in the Industrial Park of New-Richmond.

Period of execution from June 2006 to October 2006.
Total cost of the project: 2 000 000$

L’Isle-aux-Coudres, QC

techni-arp
techni-arp
techni-arp

Construction of a retaining wall in the Isle aux Coudres

From June 2005 to October 2006
Global cost: 8 000 000$

Kegaska, QC

Statement of stock pill for evaluation of quantity of materials granulat.(volumétry)

Period of execution of novenbre 2007 at December 2007.
Total cost of the project: 1 000 000$

Longue-Rive, QC

techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp

Reshaping of a mountain of shavings for factory Krugger the wood.

Period of execution from September 2007 to December 2007.
Total cost of the project: 2 000 000$

Péribonka

techni-arp
techni-arp
techni-arp
techni-arp
techni-arp
techni-arp

Péribonka Hydro-Québec dam

From July 2005 to December 2005
Global cost: 45 000 000$

Mistissini

techni-arp
techni-arp
techni-arp

Construction of a municipal road (égoût and aqueduct) for a new residential development.

Period of execution from June 2007 to October 2007.
Total cost of the project: 2 500 000$

Abitibi

techni-arp

Construction of and a site access road of storage of material aggregate for the opening of a mine.

Period of execution from November 2007 to March 2008.
Total cost of the project: 3 000 000$

Goose Bay

techni-arp

Goose Bay National Defense airport Labrador

From July 2006 to August 2007
Global cost: 16 000 000.00$

Schefferville

techni-arp
techni-arp
techni-arp

Construction of ballfield, a station of train, a station of water pumping and of a road for a new residential sector on the reserve of Kawawachikamach.

Period of execution from June 2005 to November 2007.
Total cost of the project: 4 000 000$

Eastmain

techni-arp
techni-arp
techni-arp

Construction of the sporting center with Eastmain 1-A
for the Hydro-electric power station of the SEBJ

From May to July 2007
Global cost: 3 000 000$

80 km access road for the opening of a gold mine to Eastmain

From 2007 à 2009 (currently in course)
Cost of the project and fee to come

Drummondville, QC

techni-arp
techni-arp
techni-arp
techni-arp

Construction of a station gasoline Irving Big Stop in Saint-Liboire along Motorway 20.

Period of execution from June 2006 to June 2007.
Total cost of the project: 8 000 000$